Wind Energy Components - News, Trends, Wind Energy Components Links

1 - 1 of 1

Wind turbine investment cost break-up

Investment ('000 euros per MW), (% of total investment) - Turbine ex works (928), (75.6), Foundation (80), (6.5), Eelctric installation (18), (1.5), Grid connection (109), (8.9), Control system (4), (0.3), Consultancy (15), (1.2), Land (48), (3.9), Financial costs (15), (1.2), Road (11), (0.9) - Total - 1227. Calculations by the author based on selected data for European wind turbine installations - Read More

Tags : wind energy wind energy europe wind energy cost wind turbines

Topics : Wind Energy

1 - 1 of 1